Saturday, November 22, 2014 Skip Navigation Links
Home
About Us
Committtees
Annual Reports
Tenders
RTI
Bulletin
Links
Site Map
Contact Us
FAQ
Skip Navigation Links
Acts & Policies
Rules & Guidelines
Regulations
Orders
Documents
Draft-Regulation/Document
Notices
Schedule of Hearings
Record of Procedings
Electricity Ombudsman
Consumer Grievance Redressal Forums
Energy Efficiency & Demand Side Mgmt
Power Sector Updates
Archives
Vacancy
PVVNLMVVNLPuVVNLDVVNLKESCONPCL
PVVNLMVVNLPuVVNLDVVNLKESCONPCL
User Login
Language
 
 
 
 
 
 
Order dated 17/11/14 for determination of tariff for supply of electricity from Waste Heat Energy base co-generating plant in the matter of M/s SKI Carbon Black (India) Pvt. Ltd. in Petition no 953/2014     Order dated 17/11/14 for establishment of a fresh prudence check committee and to provide the copy of report submitted by the committee in the matter of Shri Bharat Jhunjhunwala Vs. Alaknanda in Petition no 974/2014     Order dated 17/11/14 for extension of bid process timelines of Case – 1 bidding process and procurement of rest of the requisitioned capacity of 6000 MW base load power in the matter of UPPCL in Petition no 964/2014.     Draft - UPERC (Captive and Renewable Energy Generating Plants) Regulations, 2014” (CRE Regulations, 2014) alongwith the Explanatory Memorandum and Public Notice dated 5-11-2014 [Last Date : 21-11-2014]     Order dated 11/11/14 for One Time Settlement Scheme (OTS) of 100 % Surcharge Waiver for LMV-1(RURAL), LMV-2 (RURAL) and LMV-5 (RURAL) Consumers in the camps being organized between 11.11.2014 to 10-1-2015 in MVVNL/PuVVNL/PVVNL/DVVNL & KESCO in Petition no 977/2014     Corrigendum order dated 13/11/14 for One Time Settlement Scheme (OTS) of 100 % Surcharge Waiver for LMV-1(RURAL), LMV-2 (RURAL) and LMV-5 (RURAL) Consumers in the camps being organized between 11.11.2014 to 10-1-2015.     Public Notice dated 06-06-2014 - Proposed 5th Amendment of Electricity Supply Code, 2005 [Last Date:30-06-2014]     Comments on Suggetions on Discussion Paper on UPERC (Terms and Conditions of Generation Tariff) Regulations for 2014-19 [31-03-2014]     Comments and Suggestions on Discussion Paper of UPERC (Captive and Non-Conventional Energy Generating Plants) Regulations, 2014 [Last Date: 15-05-2014]     
 
Click to see Latest Upload
  Keeping the restructuring of the power sector in mind, the government of Uttar Pradesh has enacted the U. P. Electricity Reform Act 1999 and has set up the U. P. Electricity Regulatory Commission (UPERC), as an autonomous body corporate. It consists of three members, one of whom is nominated as the Chairman of the Commission. With its headquarters in Lucknow, the Commission is entitled to conduct its proceedings, consultations and hearings in other places in the state also.The Commission has the exclusive power to make regulations for the conduct of its proceedings and discharge of its functions.The Commission is vested with the same powers as that of a Civil Court under the Code of Civil Procedure 1908 (Central Act 5 of 1908) for obtaining information and evidence.
 
  Core Values  
 
U NBIASED OUTLOOK  
P ROFESSIONAL APPROACH
E THICS & TRANSPARENCY  
R EGULATORY COMPETENCE
C ONSUMER FOCUS
 
 
 
Vision
To be an effective Electricity Regulatory Commission contributing to the accelerated growth of the power sector in Uttar Pradesh
Mission
To regulate the power sector in a manner that uninterrupted and cost effective electricity is available to each and every household of Uttar Pradesh.
     
 
 
 
 
 
 
 
 
 
 
 
UPERC, Lucknow
U.P. Electricity Regulatory Commission
II Floor, Kisan Mandi Bhawan, Gomti Nagar,Vibhuti Khand, Lucknow-226010
Phone: +91-522-2720426,Fax: +91-522-2720423
Email Id: secretary@uperc.org
 
 
Chairman's Desk
Highlights
Picture Gallary
Total Hits
0364266
Home  |  Picture Gallary  | SiteMap  |  Contact Us
Disclaimer: While every care has been taken to ensure the accuracy of information furnished in this website, UPERC does not accept any responsibility or liability for any damage or loss to any person / institution / organization for the result of any action taken on the basis of this information. However, UPERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.
 Design By: WizTech Consultancy      "Best viewed on IE.7 and above at 1024x768 resolution"