S.No. | Title | Path | |
1 | Notice dated 08/07/25 for 2100 of 2024 - UPPCL - Approval of procurement of 690 MW of Wind Power in terms of the PSA dated 19.10.2023 on long term basis procured through tariff based competitive bidding process held under the Inter State Transmission System Tranche-XIV Scheme. in Petition no 2100/2024 | NoticePt-no-2100of2024UPPCL-29-07-2025(1)-PDF714202542133PM.pdf | Notice dated 08/07/25 for 2100 of 2024 - UPPCL - Approval of procurement of 690 MW of Wind Power in terms of the PSA dated 19.10.2023 on long term basis procured through tariff based competitive bidding process held under the Inter State Transmission System Tranche-XIV Scheme. in Petition no 2100/2024 |
2 | Notice dated 03/07/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024 | MVVNLDateChangePublicNoticeFY25-26-PDF73202554517PM.pdf | Notice dated 03/07/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024 |
3 | Notice dated 02/07/25 for 967 of 2015 - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation
Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 967/2015 | NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552557PM.pdf | Notice dated 02/07/25 for 967 of 2015 - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation
Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 967/2015 |
4 | Notice dated 02/07/25 for 968 of 2015 - - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 968/2015 | NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552619PM.pdf | Notice dated 02/07/25 for 968 of 2015 - - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 968/2015 |
5 | Notice dated 02/07/25 for 1016 of 2015 - Rosa Power Supply Company Limited - Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 1016/2015 | NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552634PM.pdf | Notice dated 02/07/25 for 1016 of 2015 - Rosa Power Supply Company Limited - Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 1016/2015 |
6 | Notice dated 30/06/25 for 2152 of 2024 - UPRVUNL (Anpara -A) - Petition for True-up of 3 x 210 MW Anpara-A TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2152/2024 | NoticePt-no-2152of2024UPRVUNL-22-07-2025-PDF712025124310PM.pdf | Notice dated 30/06/25 for 2152 of 2024 - UPRVUNL (Anpara -A) - Petition for True-up of 3 x 210 MW Anpara-A TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2152/2024 |
7 | Notice dated 30/06/25 for 2153 of 2024 - UPRVUNL (Parichha Ext.-II) -Petition for True-up of 2x 250 MW Parichha Ext.-II TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2153/2024 | NoticePt-no-2153of2024UPRVUNL-22-07-2025-PDF712025124322PM.pdf | Notice dated 30/06/25 for 2153 of 2024 - UPRVUNL (Parichha Ext.-II) -Petition for True-up of 2x 250 MW Parichha Ext.-II TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2153/2024 |
8 | Notice dated 30/06/25 for 2154 of 2024 - UPRVUNL (Harduaganj-C) - Petition for True-up of 1 x 110 MW Harduaganj-C TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2154/2024 | NoticePt-no-2154of2024UPRVUNL-22-07-2025-PDF712025124334PM.pdf | Notice dated 30/06/25 for 2154 of 2024 - UPRVUNL (Harduaganj-C) - Petition for True-up of 1 x 110 MW Harduaganj-C TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2154/2024 |
9 | Notice dated 30/06/25 for 2155 of 2024 -UPRVUNL (Obra-B) - Petition for True-up of 5 x 200 MW Obra-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2155/2024 | NoticePt-no-2155of2024UPRVUNL-22-07-2025-PDF712025124344PM.pdf | Notice dated 30/06/25 for 2155 of 2024 -UPRVUNL (Obra-B) - Petition for True-up of 5 x 200 MW Obra-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2155/2024 |
10 | Notice dated 30/06/25 for 2156 of 2024 - UPRVUNL (Harduaganj-Ext) - Petition for True-up of 2 x 250 MW Harduaganj-Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2156/2024 | NoticePt-no-2156of2024UPRVUNL-22-07-2025-PDF712025124355PM.pdf | Notice dated 30/06/25 for 2156 of 2024 - UPRVUNL (Harduaganj-Ext) - Petition for True-up of 2 x 250 MW Harduaganj-Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2156/2024 |
11 | Notice dated 30/06/25 for 2157 of 2024 -UPRVUNL (Parichha Extn) - Petition for True-up of 2 x 110 MW Parichha Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2157/2024 | NoticePt-no-2157of2024UPRVUNL-22-07-2025-PDF712025124406PM.pdf | Notice dated 30/06/25 for 2157 of 2024 -UPRVUNL (Parichha Extn) - Petition for True-up of 2 x 110 MW Parichha Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2157/2024 |
12 | Notice dated 30/06/25 for 2158 of 2024 - UPRVUNL (Anpara-B) - Petition for True-up of 2 x 500 MW Anpara-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2158/2024 | NoticePt-no-2158of2024UPRVUNL-22-07-2025-PDF712025124415PM.pdf | Notice dated 30/06/25 for 2158 of 2024 - UPRVUNL (Anpara-B) - Petition for True-up of 2 x 500 MW Anpara-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2158/2024 |
13 | Notice dated 27/06/25 for 2224 of 2025 - UPPCL - Seeking approval of procurement of250 MW/1000 MWh Standalone Battery Energy storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2224/2025 | NoticePt-no-2224of2025UPPCL-31-07-2025-PDF71202510039PM.pdf | Notice dated 27/06/25 for 2224 of 2025 - UPPCL - Seeking approval of procurement of250 MW/1000 MWh Standalone Battery Energy storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2224/2025 |
14 | Notice dated 27/06/25 for 2225 of 2025 - UPPCL - Seeking approval of procurement of 375 MW/1500 MWh Standalone Battery Energy Storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2225/2025 | NoticePt-no-2225of2025UPPCL-31-07-2025-PDF71202510053PM.pdf | Notice dated 27/06/25 for 2225 of 2025 - UPPCL - Seeking approval of procurement of 375 MW/1500 MWh Standalone Battery Energy Storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2225/2025 |
15 | Public Notice dated 24/06/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024 | PublicNotice-HearingsFY2025-26-PDF624202551846PM.pdf | Public Notice dated 24/06/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024 |
16 | Public Notice dated 24/06/25 for 2165 of 2024 - Dakshinanchal Vidyut Vitran Nigam Ltd. - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2165/2024 | PublicNotice-HearingsFY2025-26-PDF624202551916PM.pdf | Public Notice dated 24/06/25 for 2165 of 2024 - Dakshinanchal Vidyut Vitran Nigam Ltd. - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2165/2024 |
17 | Public Notice dated 24/06/25 for 2168 of 2024 - NPCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2168/2024 | PublicNotice-HearingsFY2025-26-PDF624202551939PM.pdf | Public Notice dated 24/06/25 for 2168 of 2024 - NPCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2168/2024 |
18 | Notice dated 20/06/25 for 2221 of 2025 - UPPCL - Approval for SPPA dated 28.04.2025 for supply of 21 MW power from 24.70 MW MSW based power plant at Kuberpur, Agra, UP in Petition no 2221/2025 | 2221-PDF620202555030PM.pdf | Notice dated 20/06/25 for 2221 of 2025 - UPPCL - Approval for SPPA dated 28.04.2025 for supply of 21 MW power from 24.70 MW MSW based power plant at Kuberpur, Agra, UP in Petition no 2221/2025 |
19 | Notice dated 20/06/25 for 2226 of 2025 - MEIL Anpara Energy Limited -Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2024-25 according to the Notification No. S.O. 5481(E) dated 31.12.2021 issued by the Ministry of Environment, Forest & Climate Change, Government of India and the methodology prescribed by this Hon’ble Commission. in Petition no 2226/2025 | 2226-PDF620202555015PM.pdf | Notice dated 20/06/25 for 2226 of 2025 - MEIL Anpara Energy Limited -Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2024-25 according to the Notification No. S.O. 5481(E) dated 31.12.2021 issued by the Ministry of Environment, Forest & Climate Change, Government of India and the methodology prescribed by this Hon’ble Commission. in Petition no 2226/2025 |
20 | Public Notice dated 20/06/25 for 2162 of 2024 - Paschimanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 | PublicNotice-HearingsFY2025-26-PDF624202551655PM.pdf | Public Notice dated 20/06/25 for 2162 of 2024 - Paschimanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 |
21 | Public Notice dated 20/06/25 for 2163 of 2024 - Purvanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2163/2024 | PublicNotice-HearingsFY2025-26-PDF624202551720PM.pdf | Public Notice dated 20/06/25 for 2163 of 2024 - Purvanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2163/2024 |
22 | Public Notice dated 20/06/25 for 2176 of 2024 - KESCO -True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2176/2024 | PublicNotice-HearingsFY2025-26-PDF624202554233PM.pdf | Public Notice dated 20/06/25 for 2176 of 2024 - KESCO -True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2176/2024 |
23 | Notice dated 18/06/25 for 2218 of 2025 - UPPCL - Approval of tender documents namely RFQ, RFP, and PPA for procurement of 2000 MW of Source Agnostic Peak Power for Long Term for Commencement year 2029-30 in Petition no 2218/2025 | NoticePt-no-2218of2025UPPCL-26-08-2025-PDF620202525629PM.pdf | Notice dated 18/06/25 for 2218 of 2025 - UPPCL - Approval of tender documents namely RFQ, RFP, and PPA for procurement of 2000 MW of Source Agnostic Peak Power for Long Term for Commencement year 2029-30 in Petition no 2218/2025 |
24 | Notice dated 05/06/25 for 2141 of 2024 - UPRVUNL - Petition for True-up of Parichha (110 MW) Thermal Power Station of UPRVUNL for FY 2019-20 to 2023-24 in Petition no 2141/2024 | NoticePt-no-2141of2024UPRVUNL-12-06-2025-PDF662025115849AM.pdf | Notice dated 05/06/25 for 2141 of 2024 - UPRVUNL - Petition for True-up of Parichha (110 MW) Thermal Power Station of UPRVUNL for FY 2019-20 to 2023-24 in Petition no 2141/2024 |
25 | Notice dated 05/06/25 for 2217 of 2025 - B & G Renewable Energy Pvt. Ltd. Nirgajini Hydel Project Pvt. Ltd. Salawa Hydel Project Pvt. Ltd. - Seeking additional tariff on account of Change in Law events and quantification of tariff escalation on account of increase in capital cost as claimed in the prayer of its petition in Petition no 2217/2025 | NoticePt-no-2217of2025B&GRenewable-08-07-2025-PDF662025120840PM.pdf | Notice dated 05/06/25 for 2217 of 2025 - B & G Renewable Energy Pvt. Ltd. Nirgajini Hydel Project Pvt. Ltd. Salawa Hydel Project Pvt. Ltd. - Seeking additional tariff on account of Change in Law events and quantification of tariff escalation on account of increase in capital cost as claimed in the prayer of its petition in Petition no 2217/2025 |
26 | Notice dated 30/05/25 for 2197 OF 2025 - UPPCL - Seeking approval of the Request for Qualification, Request for proposal and PPA for Invitation of E-Tender for procurement of 2000 MW Source Agnostic Peak Hour Peak Month Power for Long Term (25 Years) under finance, own, & operate along with the Deviations. in Petition no 2197/2025 | NoticePt-no-2197of2025-UPPCL-17-06-2025-PDF530202555436PM.pdf | Notice dated 30/05/25 for 2197 OF 2025 - UPPCL - Seeking approval of the Request for Qualification, Request for proposal and PPA for Invitation of E-Tender for procurement of 2000 MW Source Agnostic Peak Hour Peak Month Power for Long Term (25 Years) under finance, own, & operate along with the Deviations. in Petition no 2197/2025 |
27 | Notice dated 30/05/25 for 2213 of 2025 - UPPCL - Approval for tender documents including the request for Qualification, Request for Proposal and Draft PPA to be floated by UPPCL for Procurement of 1000 MW of source Agnostic Peak Power for medium Term in Petition no 2213/2025 | NoticePt-no-2213of2025-UPPCL-17-06-2025-PDF530202555451PM.pdf | Notice dated 30/05/25 for 2213 of 2025 - UPPCL - Approval for tender documents including the request for Qualification, Request for Proposal and Draft PPA to be floated by UPPCL for Procurement of 1000 MW of source Agnostic Peak Power for medium Term in Petition no 2213/2025 |
28 | Notice dated 27/05/25 for 2059 of 2024 - Lt. Co. (Retd.) Jagh Narain Dubey and ors vs DM Ayodhya, UPPTCL and ors - Revision Petition for quash the impugned order dated 09.05.2023 passed by the DM Ayodhaya. in Petition no 2059/2024 | NoticeofPetitionNo-2059of2024(1)-pdf528202521930PM.pdf | Notice dated 27/05/25 for 2059 of 2024 - Lt. Co. (Retd.) Jagh Narain Dubey and ors vs DM Ayodhya, UPPTCL and ors - Revision Petition for quash the impugned order dated 09.05.2023 passed by the DM Ayodhaya. in Petition no 2059/2024 |
29 | Notice dated 23/05/25 for 2215 of 2025 - UP State Load Dispatch Centre Ltd. vs UPPCL, UPRVUNL, Principal Secretary (Irrigation) - Seeking relaxation in complying with certain directions of the order dated 17.02.2023 passed by this Hon’ble Commission in 59 SM, 60 SM and 61 SM of 2022 and directions in its order dated 10.10.2024 passed by this Commission in Pet. No. 1980 of 2023, 2045 of 2023 and 2046 of 2023 in Petition no 2215/2025 | Petitionno-2215of2025(2)-pdf5262025111933AM.pdf | Notice dated 23/05/25 for 2215 of 2025 - UP State Load Dispatch Centre Ltd. vs UPPCL, UPRVUNL, Principal Secretary (Irrigation) - Seeking relaxation in complying with certain directions of the order dated 17.02.2023 passed by this Hon’ble Commission in 59 SM, 60 SM and 61 SM of 2022 and directions in its order dated 10.10.2024 passed by this Commission in Pet. No. 1980 of 2023, 2045 of 2023 and 2046 of 2023 in Petition no 2215/2025 |
30 | Notice dated 22/05/25 for Quashing the first information report 1092 of 2025 lodge under section 135 of electricity act (State of U.P vs. Vijay Narayan Tiwari) in Petition no 2216/2025 | NoticeVijayNarainTiwari,Pet-No-2216of25-PDF522202564308PM.pdf | Notice dated 22/05/25 for Quashing the first information report 1092 of 2025 lodge under section 135 of electricity act (State of U.P vs. Vijay Narayan Tiwari) in Petition no 2216/2025 |
31 | Notice dated 21/05/25 for 2151 of 2024 - Alaknanda Hydro Power Corporation - Petition for Truing up of Tariff for 330 MW (4x x82.5 MW) Shrinagar Hydro Electric Project for the Control Period FY 2019-20 to FY 2023-24 in Petition no 2151/2024 | NoticePt-no-2151of2024AHPCL-27-05-2025-PDF521202540911PM.pdf | Notice dated 21/05/25 for 2151 of 2024 - Alaknanda Hydro Power Corporation - Petition for Truing up of Tariff for 330 MW (4x x82.5 MW) Shrinagar Hydro Electric Project for the Control Period FY 2019-20 to FY 2023-24 in Petition no 2151/2024 |
32 | Public Notice on Draft UPERC (Fees & Charges of State Load Despatch Centre and other related matters) Regulations 2025 | DraftUPERC(Fees&ChargesofSLDCandotherrelatedmatters)Regulation,2025-pdf519202565022PM.pdf | Public Notice on Draft UPERC (Fees & Charges of State Load Despatch Centre and other related matters) Regulations 2025 |
33 | Notice dated 19/05/25 for 2214 of 2025 - B & G Renewable Energy Pvt. Ltd., Nirgajini Hydel Project Pvt. Ltd., Salawa Hydel Project Pvt. Ltd. - Seeking extension of the Commercial Operation Date under the PPA as claimed in the prayer of the petition in Petition no 2214/2025 | NoticePt-no-2214of2025B&GRenewable-10-06-2025(1)-PDF520202554706PM.pdf | Notice dated 19/05/25 for 2214 of 2025 - B & G Renewable Energy Pvt. Ltd., Nirgajini Hydel Project Pvt. Ltd., Salawa Hydel Project Pvt. Ltd. - Seeking extension of the Commercial Operation Date under the PPA as claimed in the prayer of the petition in Petition no 2214/2025 |
34 | Notice dated 16/05/25 for 2215 of 2025 - UP State Load Dispatch Centre Ltd. vs UPPCL, UPRVUNL, Principal Secretary (Irrigation) - Seeking relaxation in complying with certain directions of the order dated 17.02.2023 passed by this Hon’ble Commission in 59 SM, 60 SM and 61 SM of 2022 and directions in its order dated 10.10.2024 passed by this Commission in Pet. No. 1980 of 2023, 2045 of 2023 and 2046 of 2023 in Petition no 2215/2025 | NoticeofPetitionNo-2215of2025-pdf516202560802PM.pdf | Notice dated 16/05/25 for 2215 of 2025 - UP State Load Dispatch Centre Ltd. vs UPPCL, UPRVUNL, Principal Secretary (Irrigation) - Seeking relaxation in complying with certain directions of the order dated 17.02.2023 passed by this Hon’ble Commission in 59 SM, 60 SM and 61 SM of 2022 and directions in its order dated 10.10.2024 passed by this Commission in Pet. No. 1980 of 2023, 2045 of 2023 and 2046 of 2023 in Petition no 2215/2025 |
35 | Public Notice dated 09/05/25 for 2149 of 2025 - UPPCL and ors -Seeking amendments in Regulations 10.3(ii) of the UPERC RSPV Regulations on behalf of Distribution Companies of UPPCL by invoking Regulation 16 and 17 of UPERC RSPV Regulations, 2019 in Petition no 2149/2025 | 2149publicnoticeandpetition-pdf59202560339PM.pdf | Public Notice dated 09/05/25 for 2149 of 2025 - UPPCL and ors -Seeking amendments in Regulations 10.3(ii) of the UPERC RSPV Regulations on behalf of Distribution Companies of UPPCL by invoking Regulation 16 and 17 of UPERC RSPV Regulations, 2019 in Petition no 2149/2025 |
36 | Notice dated 09/05/25 for 2143 of 2024 - RPSCL - Petition seeking approval of Truing-up of Capital Expenditure and Tariff for the Control period FY 2019-20 to FY 2023-24 in Petition no 2143/2024 | NoticePt-no-2143of2024-RPSCL-20-05-2025-PDF513202542254PM.pdf | Notice dated 09/05/25 for 2143 of 2024 - RPSCL - Petition seeking approval of Truing-up of Capital Expenditure and Tariff for the Control period FY 2019-20 to FY 2023-24 in Petition no 2143/2024 |
37 | Notice dated 09/05/25 for 2144 of 2024 - Bajaj Energy Limited - Khambarkhera - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Khambankhera TPP. in Petition no 2144/2024 | NoticePt-no-2144of2024-BEL-22-05-2025-PDF513202550658PM.pdf | Notice dated 09/05/25 for 2144 of 2024 - Bajaj Energy Limited - Khambarkhera - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Khambankhera TPP. in Petition no 2144/2024 |
38 | Notice dated 09/05/25 for 2145 of 2024 - Bajaj Energy Limited - Utraula - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Utraula TPP. in Petition no 2145/2024 | NoticePt-no-2145of2024-BEL-22-05-2025-PDF513202550708PM.pdf | Notice dated 09/05/25 for 2145 of 2024 - Bajaj Energy Limited - Utraula - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Utraula TPP. in Petition no 2145/2024 |
39 | Notice dated 09/05/25 for 2146 of 2024 - Bajaj Energy Limited - Kundarki - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Kundarki TPP. in Petition no 2146/2024 | NoticePt-no-2146of2024-BEL-22-05-2025-PDF513202550719PM.pdf | Notice dated 09/05/25 for 2146 of 2024 - Bajaj Energy Limited - Kundarki - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Kundarki TPP. in Petition no 2146/2024 |
40 | Notice dated 09/05/25 for 2147 of 2024- Bajaj Energy Limited - Maqsoodpur - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Maqsoodapur TPP in Petition no 2147/2024 | NoticePt-no-2147of2024-BEL-22-05-2025-PDF513202550728PM.pdf | Notice dated 09/05/25 for 2147 of 2024- Bajaj Energy Limited - Maqsoodpur - Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Maqsoodapur TPP in Petition no 2147/2024 |
41 | Notice dated 09/05/25 for 2148 of 2024 - Bajaj Energy Limited -Barkhera -Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Barkhera TPP in Petition no 2148/2024 | NoticePt-no-2148of2024-BEL-22-05-2025-PDF513202550744PM.pdf | Notice dated 09/05/25 for 2148 of 2024 - Bajaj Energy Limited -Barkhera -Truing-up for the period from 01.04.2019 to 31.03.2024 in respect of 2 X 45 MW Barkhera TPP in Petition no 2148/2024 |
42 | Notice dated 09/05/25 for 2150 of 2024 - Dhariwal Infrastructure Ltd. - Truing-up of Annual Revenue Requirement and final Generation Tariff Period FY 2019-20 to FY 2023-24 for supply of 187 Gross Contracted Capacity to NPCL in Petition no 2150/2024 | NoticePt-no-2150of2024DIL-20-05-2025-PDF513202550812PM.pdf | Notice dated 09/05/25 for 2150 of 2024 - Dhariwal Infrastructure Ltd. - Truing-up of Annual Revenue Requirement and final Generation Tariff Period FY 2019-20 to FY 2023-24 for supply of 187 Gross Contracted Capacity to NPCL in Petition no 2150/2024 |
43 | Public Notice UPERC (Captive and Renewable Energy Generating Plants) Regulations 2024 | DraftCRERegulations2024-pdf57202590850PM.pdf | Public Notice UPERC (Captive and Renewable Energy Generating Plants) Regulations 2024 |
44 | Notice dated 05/05/25 for 2200 of 2025 - UPPTCL - Petition for 05 years STU Rolling Transmission Plan for period of FY 2025-26 to FY 2029-30 in Petition no 2200/2025 | Notice(PetitionNo-2200of2025)-pdf55202534529PM.pdf | Notice dated 05/05/25 for 2200 of 2025 - UPPTCL - Petition for 05 years STU Rolling Transmission Plan for period of FY 2025-26 to FY 2029-30 in Petition no 2200/2025 |
45 | Notice dated 05/05/25 for 2211 of 2025 - UPPCL - Approval of the Resource Adequacy plan of UP Distribution Companies MVVNL, DVVNl, PVVNL and PuVVNL for the period FY 2025-26 to 2034-35 in Petition no 2211/2025 | NoticeforAdmissioninPetitionNo-2211of2025(UPPCL)-PDF516202552019PM.pdf | Notice dated 05/05/25 for 2211 of 2025 - UPPCL - Approval of the Resource Adequacy plan of UP Distribution Companies MVVNL, DVVNl, PVVNL and PuVVNL for the period FY 2025-26 to 2034-35 in Petition no 2211/2025 |
46 | Notice dated 05/05/25 for 2188 of 2025 - UPRVUNL – Panki Ext TPS - Approval of provisional Capital Cost, ARR & determination of Provisional Tariff in respect of 1 x 660 MW. in Petition no 2188/2025 | NoticePt-no-2188of2024UPRVUNL-13-05-2025-PDF562025121456PM.pdf | Notice dated 05/05/25 for 2188 of 2025 - UPRVUNL – Panki Ext TPS - Approval of provisional Capital Cost, ARR & determination of Provisional Tariff in respect of 1 x 660 MW. in Petition no 2188/2025 |
47 | Notice dated 05/05/25 for 2201 of 2025 - UPPCL - Seeking approval of SPPA dated 11.11.2024 for 2 x 660 MW Anpara C Thermal Power Project and Change of Name. in Petition no 2201/2025 | NoticePt-no-2201of2024-UPPCL-13-05-2025-PDF562025121735PM.pdf | Notice dated 05/05/25 for 2201 of 2025 - UPPCL - Seeking approval of SPPA dated 11.11.2024 for 2 x 660 MW Anpara C Thermal Power Project and Change of Name. in Petition no 2201/2025 |
48 | Notice dated 05/05/25 for 2203 of 2025 - NPCL - Seeking partial review of the Order 09.12.2024 passed by this Hon’ble Commission in Petition No. 2108 of 2024: Dhariwal Infrastructure Limited vs. Noida Power Company Limited (in relation to prudence check of the cost for procurement and use of Additional Coal on account of shortfall in supply of FSA Grade Coal in FY 2023-24). in Petition no 2203/2025 | NoticePt-no-2203of2025-NPCL-20-05-2025-PDF562025122531PM.pdf | Notice dated 05/05/25 for 2203 of 2025 - NPCL - Seeking partial review of the Order 09.12.2024 passed by this Hon’ble Commission in Petition No. 2108 of 2024: Dhariwal Infrastructure Limited vs. Noida Power Company Limited (in relation to prudence check of the cost for procurement and use of Additional Coal on account of shortfall in supply of FSA Grade Coal in FY 2023-24). in Petition no 2203/2025 |
49 | Notice dated 05/05/25 for 2212 of 2025 - NPCL - Petition under section 62 and 86(1)(b) of the electricity act, 2003 read with order dated 14.07.2015 in petition no 1012 of 2015 for determination of tariff and extension of power purchase agreement executed with Greater Noida Industrial Development Authority (“GNIDA”) and determination of tariff for procurement of 1 MWP solar power generated from generating plant at greater Noida in Petition no 2212/2025 | NoticePt-no-2212of2025NPCL-29-05-2025-PDF562025122515PM.pdf | Notice dated 05/05/25 for 2212 of 2025 - NPCL - Petition under section 62 and 86(1)(b) of the electricity act, 2003 read with order dated 14.07.2015 in petition no 1012 of 2015 for determination of tariff and extension of power purchase agreement executed with Greater Noida Industrial Development Authority (“GNIDA”) and determination of tariff for procurement of 1 MWP solar power generated from generating plant at greater Noida in Petition no 2212/2025 |
50 | Notice dated 01/05/25 for non-compliance of CGRF/Ombudsman order in Ombudsman Appeal/CGRF complain No 140/2021 | FaisalWarsi140of2021-PDF51202532434PM.pdf | Notice dated 01/05/25 for non-compliance of CGRF/Ombudsman order in Ombudsman Appeal/CGRF complain No 140/2021 |
|