Friday, August 29, 2025
Home
Commission
Officers
Committee
Annual Reports
Tenders
Right To Information
Contact Us
Regulations
Orders
Tariff Orders
Orders u/s 142
Notices
Schedule of Hearings
Record of Procedings
Draft-Regulations
Repealed
Licenses
Procedures/Agreements
Supply Code
Cost Data Book
Other Documents
Electricity Ombudsman
Vacancy
Policies
UP Govt Policies
Rules
Guidelines
CEA Regulation (Technical)
Information-4(1)(b) RTI
Expert Committee Reports
Tariff Filing Portal (For Licensees)
Tariff Dashboard
PVVNLMVVNLPuVVNLDVVNLKESCONPCL
PVVNLMVVNLPuVVNLDVVNLKESCONPCL
User Login
 
 
 
 
 
 
 
 
       Notices
Previous Years Financial Year 2025-2026
S.No.TitlePath 
1Notice dated 25/08/25 for 2219 of 2025 - UPPCL vs LPGCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025RescheduledNoticePt-no-2219of2025-UPPCL-18-09-2025-PDF826202534347PM.pdfNotice dated 25/08/25 for 2219 of 2025 - UPPCL vs LPGCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025
2Notice dated 22/08/25 for 2268 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2268/2025NoticePt-no-2268of2025UPNEDAandUPPCL-18-09-2025(1)-PDF825202543242PM.pdfNotice dated 22/08/25 for 2268 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2268/2025
3Notice dated 19/08/25 for 2261 of 2025 - UPPCL - Approval of PPA dated 16.06.2025 for Khara Small Hydro Project with Total capacity of 1.5 MW (2 x 0.75) for a period of forty years executed between UPPPCL and UPRVUNL in Petition no 2261/2025NoticePt-no-2261of2025UPPCL-18-09-2025-PDF820202512717PM.pdfNotice dated 19/08/25 for 2261 of 2025 - UPPCL - Approval of PPA dated 16.06.2025 for Khara Small Hydro Project with Total capacity of 1.5 MW (2 x 0.75) for a period of forty years executed between UPPPCL and UPRVUNL in Petition no 2261/2025
4Notice dated 19/08/25 for 2262 of 2025 - UPPCL - Approval of PSA dated 21.06.2025 entered into with NHPC Limited for purchase of 300 MW Capacity of Hybrid Energy. in Petition no 2262/2025NoticePt-no-2262of2025UPPCL-18-09-2025-PDF820202512730PM.pdfNotice dated 19/08/25 for 2262 of 2025 - UPPCL - Approval of PSA dated 21.06.2025 entered into with NHPC Limited for purchase of 300 MW Capacity of Hybrid Energy. in Petition no 2262/2025
5Notice dated 14/08/25 for 2253 of 2025 - UPNEDA and UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2253/2025NoticePt-no-2253of2025UPNEDAandUPPCL-09-09-2025-PDF8182025120425PM.pdfNotice dated 14/08/25 for 2253 of 2025 - UPNEDA and UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2253/2025
6Notice dated 14/08/25 for 2254 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2254/2025NoticePt-no-2254of2025UPNEDAandUPPCL-09-09-2025-PDF8182025120442PM.pdfNotice dated 14/08/25 for 2254 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2254/2025
7Notice dated 12/08/25 for 2207 of 2025 - Ameer Ullah - Revision to set aside the impugned order dated 20.06.2024 of DM Prayagraj in Petition no 2207/2025NoticeofPetitionNo-2207of2025-pdf812202560330PM.pdfNotice dated 12/08/25 for 2207 of 2025 - Ameer Ullah - Revision to set aside the impugned order dated 20.06.2024 of DM Prayagraj in Petition no 2207/2025
8Notice dated 12/08/25 for 2210 of 2025 - UPPCL - Seeking relaxation in complying with directions issued in the orders passed by this Commission in 59SM, 60SM and 61 SM of 2022 in Petition no 2210/2025NoticeofPetitionNo-2210of2025-pdf812202560359PM.pdfNotice dated 12/08/25 for 2210 of 2025 - UPPCL - Seeking relaxation in complying with directions issued in the orders passed by this Commission in 59SM, 60SM and 61 SM of 2022 in Petition no 2210/2025
9Notice dated 12/08/25 for 2220 of 2025 - UPSLDC - Seeking Clarification of this Commission on the issue of settlement of legacy dues claimed by Northern Region Load Dispatch Centre from the DSM Account maintained by UPSLDC in Commission’s order on petition no. 59 SM, 60SM and 61SM. in Petition no 2220/2025NoticeofPetitionNo-2220of2025-pdf812202560422PM.pdfNotice dated 12/08/25 for 2220 of 2025 - UPSLDC - Seeking Clarification of this Commission on the issue of settlement of legacy dues claimed by Northern Region Load Dispatch Centre from the DSM Account maintained by UPSLDC in Commission’s order on petition no. 59 SM, 60SM and 61SM. in Petition no 2220/2025
10Notice dated 12/08/25 for 2222 of 2025 - Obra -C Badaun Transmission Limited - Assignment of License and creation of security interest by way of mortgage/charge/hypothecation/assignment etc. overall the movable and immovable assets of Obra-C Badaun Transmission Limited as provided for in paragraph 11 o this petition in favour of Security Trustee/Rupee Term Lender in Petition no 2222/2025NoticeofPetitionNo-2222of2025-pdf812202555940PM.pdfNotice dated 12/08/25 for 2222 of 2025 - Obra -C Badaun Transmission Limited - Assignment of License and creation of security interest by way of mortgage/charge/hypothecation/assignment etc. overall the movable and immovable assets of Obra-C Badaun Transmission Limited as provided for in paragraph 11 o this petition in favour of Security Trustee/Rupee Term Lender in Petition no 2222/2025
11Notice dated 11/08/25 for 2223 of 2025 - Ultratech Cement Limited, Lalganj Power Pvt. Limited - Seeking an increase of Voltage connectivity level for Ultratech Cement Limited Tanda Cement Works from 33 kV to 132 kV without (revocation of Connection Agreement dated 10.08.2022 and (ii) relinquishment of LTOA granted under Bulk Transmission Agreement dated 24.12.2021 in Petition no 2223/2025NoticeofPetitionNo-2223of2025-pdf811202542127PM.pdfNotice dated 11/08/25 for 2223 of 2025 - Ultratech Cement Limited, Lalganj Power Pvt. Limited - Seeking an increase of Voltage connectivity level for Ultratech Cement Limited Tanda Cement Works from 33 kV to 132 kV without (revocation of Connection Agreement dated 10.08.2022 and (ii) relinquishment of LTOA granted under Bulk Transmission Agreement dated 24.12.2021 in Petition no 2223/2025
12Notice dated 08/08/25 for 2248 of 2025 - UPPCL - Seeking approval of Pumped Hydro Storage Power Procurement Agreement dated 23.04.2025 executed between Uttar Pradesh Power Corporation Limited and Adani Hydro Energy Five Limited and adoption of tariff discovered through Request for Selection (“RFS”) invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1250 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2248/20252248-PDF882025113027AM.pdfNotice dated 08/08/25 for 2248 of 2025 - UPPCL - Seeking approval of Pumped Hydro Storage Power Procurement Agreement dated 23.04.2025 executed between Uttar Pradesh Power Corporation Limited and Adani Hydro Energy Five Limited and adoption of tariff discovered through Request for Selection (“RFS”) invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1250 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2248/2025
13Notice dated 05/08/25 for 2219 of 2025 - UPPCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025NoticePt-no-2219of2025-UPPCL-04-09-2025-PDF85202550520PM.pdfNotice dated 05/08/25 for 2219 of 2025 - UPPCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025
14Notice dated 05/08/25 for 2228 of 2025 - UPPCL - Seeking approval of the Power Supply Agreement (PSA) dated 16.05.2025 for procurement of 1500 MW of power from thermal generating stations to be set up within Uttar Pradesh under the Design, Build, Finance, Own and Operate (DBFOO) model by sourcing fuel from the allocated coal linkage arranged under SHAKTI Policy B(iv) and for adoption of tariff discovered through competitive bidding process. in Petition no 2228/2025NoticePt-no-2228of2025UPPCL-04-09-2025-PDF85202550549PM.pdfNotice dated 05/08/25 for 2228 of 2025 - UPPCL - Seeking approval of the Power Supply Agreement (PSA) dated 16.05.2025 for procurement of 1500 MW of power from thermal generating stations to be set up within Uttar Pradesh under the Design, Build, Finance, Own and Operate (DBFOO) model by sourcing fuel from the allocated coal linkage arranged under SHAKTI Policy B(iv) and for adoption of tariff discovered through competitive bidding process. in Petition no 2228/2025
15Notice dated 04/08/25 for 2233 of 2025 - UPRVUNL - Panki Ext. - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Panki Ext. (1 X660 MW) TPS in Petition no 2233/2025NoticePt-no-2233of2025UPRVUNL-19-08-2025-PDF84202553322PM.pdfNotice dated 04/08/25 for 2233 of 2025 - UPRVUNL - Panki Ext. - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Panki Ext. (1 X660 MW) TPS in Petition no 2233/2025
16Notice dated 04/08/25 for 2237 of 2025 - UPRVUNL – Obra C - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Obra ‘C’ (2 X660 MW) TPS in Petition no 2237/2025NoticePt-no-2237of2025-UPRVUNL-19-08-2025-PDF84202553334PM.pdfNotice dated 04/08/25 for 2237 of 2025 - UPRVUNL – Obra C - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Obra ‘C’ (2 X660 MW) TPS in Petition no 2237/2025
17Notice dated 04/08/25 for 2249 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2249/2025NoticePt-no-2249of2025UPPCL-28-08-2025-PDF84202553308PM.pdfNotice dated 04/08/25 for 2249 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2249/2025
18Notice dated 04/08/25 for 2250 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 300 MW of Solar Power for a period of 25 years. in Petition no 2250/2025NoticePt-no-2250of2025UPPCL-28-08-2025-PDF84202553241PM.pdfNotice dated 04/08/25 for 2250 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 300 MW of Solar Power for a period of 25 years. in Petition no 2250/2025
19Notice dated 04/08/25 for 2251 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2251/2025NoticePt-no-2251of2025UPPCL-28-08-2025-PDF84202553254PM.pdfNotice dated 04/08/25 for 2251 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2251/2025
20Notice dated 04/08/25 for 2252 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 600 MW of Solar Power for a period of 25 years. in Petition no 2252/2025NoticePt-no-2252of2025UPPCL-28-08-2025(1)-PDF84202553423PM.pdfNotice dated 04/08/25 for 2252 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 600 MW of Solar Power for a period of 25 years. in Petition no 2252/2025
21Public Notice dated 30/07/25 for 2166 of 2024 - UPPTCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 in Petition no 2166/2024PublicNoticeforARRofUPSLDCandUPPTCL-pdf730202541515PM.pdfPublic Notice dated 30/07/25 for 2166 of 2024 - UPPTCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 in Petition no 2166/2024
22Notice dated 30/07/25 for 2231 of 2025 - UPSLDC vs UPPCL and ors - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2231/2025PublicNoticeforARRofUPSLDCandUPPTCL-pdf730202541531PM.pdfNotice dated 30/07/25 for 2231 of 2025 - UPSLDC vs UPPCL and ors - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2231/2025
23Notice dated 28/07/25 for Petition Number 1681 of 2021 - Amity University vs IL & FS Energy Development Company - Direction for recovery of money, damages and other declatory reliefs regarding PPA dated 16 Oct 2014 in Petition no 1681/20211681-PDF729202535653PM.pdfNotice dated 28/07/25 for Petition Number 1681 of 2021 - Amity University vs IL & FS Energy Development Company - Direction for recovery of money, damages and other declatory reliefs regarding PPA dated 16 Oct 2014 in Petition no 1681/2021
24Notice dated 28/07/25 for 2245 of 2025 - UPPCL - Seeking for approval of Pumped Hydro Storage Power Procurement Agreement dated 30.04.2025 executed between Uttar Pradesh Power Corporation Limited and JSW Energy PSP Six Limited and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1500 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2245/20252245-PDF729202535920PM.pdfNotice dated 28/07/25 for 2245 of 2025 - UPPCL - Seeking for approval of Pumped Hydro Storage Power Procurement Agreement dated 30.04.2025 executed between Uttar Pradesh Power Corporation Limited and JSW Energy PSP Six Limited and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1500 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2245/2025
25Notice dated 14/07/25 for Petition Number 2227 of 2025 - UPPCL vs SJVN Ltd - Seeking approval of 1200 MW of firm and Dispatchable RE(FDRE) power in terms of the Power Sale Agreement dated 20.02.2025 from Inter State Transmission System connected Renewable Energy (RE) Power Projects with Energy Storage Systems in India under Tariff based Competitive Bidding. in Petition no 2227/2025NoticePt-no-2227of2025UPPCL-05-08-2025-PDF715202532622PM.pdfNotice dated 14/07/25 for Petition Number 2227 of 2025 - UPPCL vs SJVN Ltd - Seeking approval of 1200 MW of firm and Dispatchable RE(FDRE) power in terms of the Power Sale Agreement dated 20.02.2025 from Inter State Transmission System connected Renewable Energy (RE) Power Projects with Energy Storage Systems in India under Tariff based Competitive Bidding. in Petition no 2227/2025
26Notice dated 14/07/25 for 2229 of 2025 - UPPCL vs NTPC - Approval of the PSA dated 11.04.2025 entered into with NTPC Limited for purchase of 1530 MW capacity of Firm and Dispatchable Renewable Energy. in Petition no 2229/2025NoticePt-no-2229of2025UPPCL-05-08-2025-PDF715202532636PM.pdfNotice dated 14/07/25 for 2229 of 2025 - UPPCL vs NTPC - Approval of the PSA dated 11.04.2025 entered into with NTPC Limited for purchase of 1530 MW capacity of Firm and Dispatchable Renewable Energy. in Petition no 2229/2025
27Notice dated 14/07/25 for 2230 of 2025 - UPNEDA UPPCL - Approval of PPA executed between Project Developers and UPPCL, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme. in Petition no 2230/2025NoticePt-no-2230of2025-UPNEDAandUPPCL-05-08-2025-PDF715202532754PM.pdfNotice dated 14/07/25 for 2230 of 2025 - UPNEDA UPPCL - Approval of PPA executed between Project Developers and UPPCL, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme. in Petition no 2230/2025
28Notice dated 08/07/25 for 2100 of 2024 - UPPCL - Approval of procurement of 690 MW of Wind Power in terms of the PSA dated 19.10.2023 on long term basis procured through tariff based competitive bidding process held under the Inter State Transmission System Tranche-XIV Scheme. in Petition no 2100/2024NoticePt-no-2100of2024UPPCL-29-07-2025(1)-PDF714202542133PM.pdfNotice dated 08/07/25 for 2100 of 2024 - UPPCL - Approval of procurement of 690 MW of Wind Power in terms of the PSA dated 19.10.2023 on long term basis procured through tariff based competitive bidding process held under the Inter State Transmission System Tranche-XIV Scheme. in Petition no 2100/2024
29Notice dated 03/07/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024MVVNLDateChangePublicNoticeFY25-26-PDF73202554517PM.pdfNotice dated 03/07/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024
30Notice dated 02/07/25 for 967 of 2015 - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 967/2015NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552557PM.pdfNotice dated 02/07/25 for 967 of 2015 - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 967/2015
31Notice dated 02/07/25 for 968 of 2015 - - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 968/2015NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552619PM.pdfNotice dated 02/07/25 for 968 of 2015 - - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 968/2015
32Notice dated 02/07/25 for 1016 of 2015 - Rosa Power Supply Company Limited - Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 1016/2015NoticePt-no-967,968of2014and1016of2015RPSCL-31-07-2025-PDF73202552634PM.pdfNotice dated 02/07/25 for 1016 of 2015 - Rosa Power Supply Company Limited - Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 1016/2015
33Notice dated 30/06/25 for 2152 of 2024 - UPRVUNL (Anpara -A) - Petition for True-up of 3 x 210 MW Anpara-A TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2152/2024NoticePt-no-2152of2024UPRVUNL-22-07-2025-PDF712025124310PM.pdfNotice dated 30/06/25 for 2152 of 2024 - UPRVUNL (Anpara -A) - Petition for True-up of 3 x 210 MW Anpara-A TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2152/2024
34Notice dated 30/06/25 for 2153 of 2024 - UPRVUNL (Parichha Ext.-II) -Petition for True-up of 2x 250 MW Parichha Ext.-II TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2153/2024NoticePt-no-2153of2024UPRVUNL-22-07-2025-PDF712025124322PM.pdfNotice dated 30/06/25 for 2153 of 2024 - UPRVUNL (Parichha Ext.-II) -Petition for True-up of 2x 250 MW Parichha Ext.-II TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2153/2024
35Notice dated 30/06/25 for 2154 of 2024 - UPRVUNL (Harduaganj-C) - Petition for True-up of 1 x 110 MW Harduaganj-C TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2154/2024NoticePt-no-2154of2024UPRVUNL-22-07-2025-PDF712025124334PM.pdfNotice dated 30/06/25 for 2154 of 2024 - UPRVUNL (Harduaganj-C) - Petition for True-up of 1 x 110 MW Harduaganj-C TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2154/2024
36Notice dated 30/06/25 for 2155 of 2024 -UPRVUNL (Obra-B) - Petition for True-up of 5 x 200 MW Obra-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2155/2024NoticePt-no-2155of2024UPRVUNL-22-07-2025-PDF712025124344PM.pdfNotice dated 30/06/25 for 2155 of 2024 -UPRVUNL (Obra-B) - Petition for True-up of 5 x 200 MW Obra-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2155/2024
37Notice dated 30/06/25 for 2156 of 2024 - UPRVUNL (Harduaganj-Ext) - Petition for True-up of 2 x 250 MW Harduaganj-Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2156/2024NoticePt-no-2156of2024UPRVUNL-22-07-2025-PDF712025124355PM.pdfNotice dated 30/06/25 for 2156 of 2024 - UPRVUNL (Harduaganj-Ext) - Petition for True-up of 2 x 250 MW Harduaganj-Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2156/2024
38Notice dated 30/06/25 for 2157 of 2024 -UPRVUNL (Parichha Extn) - Petition for True-up of 2 x 110 MW Parichha Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2157/2024NoticePt-no-2157of2024UPRVUNL-22-07-2025-PDF712025124406PM.pdfNotice dated 30/06/25 for 2157 of 2024 -UPRVUNL (Parichha Extn) - Petition for True-up of 2 x 110 MW Parichha Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2157/2024
39Notice dated 30/06/25 for 2158 of 2024 - UPRVUNL (Anpara-B) - Petition for True-up of 2 x 500 MW Anpara-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2158/2024NoticePt-no-2158of2024UPRVUNL-22-07-2025-PDF712025124415PM.pdfNotice dated 30/06/25 for 2158 of 2024 - UPRVUNL (Anpara-B) - Petition for True-up of 2 x 500 MW Anpara-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2158/2024
40Notice dated 27/06/25 for 2224 of 2025 - UPPCL - Seeking approval of procurement of250 MW/1000 MWh Standalone Battery Energy storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2224/2025NoticePt-no-2224of2025UPPCL-31-07-2025-PDF71202510039PM.pdfNotice dated 27/06/25 for 2224 of 2025 - UPPCL - Seeking approval of procurement of250 MW/1000 MWh Standalone Battery Energy storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2224/2025
41Notice dated 27/06/25 for 2225 of 2025 - UPPCL - Seeking approval of procurement of 375 MW/1500 MWh Standalone Battery Energy Storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2225/2025NoticePt-no-2225of2025UPPCL-31-07-2025-PDF71202510053PM.pdfNotice dated 27/06/25 for 2225 of 2025 - UPPCL - Seeking approval of procurement of 375 MW/1500 MWh Standalone Battery Energy Storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2225/2025
42Public Notice dated 24/06/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024PublicNotice-HearingsFY2025-26-PDF624202551846PM.pdfPublic Notice dated 24/06/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024
43Public Notice dated 24/06/25 for 2165 of 2024 - Dakshinanchal Vidyut Vitran Nigam Ltd. - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2165/2024PublicNotice-HearingsFY2025-26-PDF624202551916PM.pdfPublic Notice dated 24/06/25 for 2165 of 2024 - Dakshinanchal Vidyut Vitran Nigam Ltd. - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2165/2024
44Public Notice dated 24/06/25 for 2168 of 2024 - NPCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2168/2024PublicNotice-HearingsFY2025-26-PDF624202551939PM.pdfPublic Notice dated 24/06/25 for 2168 of 2024 - NPCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2168/2024
45Notice dated 20/06/25 for 2221 of 2025 - UPPCL - Approval for SPPA dated 28.04.2025 for supply of 21 MW power from 24.70 MW MSW based power plant at Kuberpur, Agra, UP in Petition no 2221/20252221-PDF620202555030PM.pdfNotice dated 20/06/25 for 2221 of 2025 - UPPCL - Approval for SPPA dated 28.04.2025 for supply of 21 MW power from 24.70 MW MSW based power plant at Kuberpur, Agra, UP in Petition no 2221/2025
46Notice dated 20/06/25 for 2226 of 2025 - MEIL Anpara Energy Limited -Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2024-25 according to the Notification No. S.O. 5481(E) dated 31.12.2021 issued by the Ministry of Environment, Forest & Climate Change, Government of India and the methodology prescribed by this Hon’ble Commission. in Petition no 2226/20252226-PDF620202555015PM.pdfNotice dated 20/06/25 for 2226 of 2025 - MEIL Anpara Energy Limited -Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2024-25 according to the Notification No. S.O. 5481(E) dated 31.12.2021 issued by the Ministry of Environment, Forest & Climate Change, Government of India and the methodology prescribed by this Hon’ble Commission. in Petition no 2226/2025
47Public Notice dated 20/06/25 for 2162 of 2024 - Paschimanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 PublicNotice-HearingsFY2025-26-PDF624202551655PM.pdfPublic Notice dated 20/06/25 for 2162 of 2024 - Paschimanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30
48Public Notice dated 20/06/25 for 2163 of 2024 - Purvanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2163/2024PublicNotice-HearingsFY2025-26-PDF624202551720PM.pdfPublic Notice dated 20/06/25 for 2163 of 2024 - Purvanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2163/2024
49Public Notice dated 20/06/25 for 2176 of 2024 - KESCO -True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2176/2024PublicNotice-HearingsFY2025-26-PDF624202554233PM.pdfPublic Notice dated 20/06/25 for 2176 of 2024 - KESCO -True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2176/2024
50Notice dated 18/06/25 for 2218 of 2025 - UPPCL - Approval of tender documents namely RFQ, RFP, and PPA for procurement of 2000 MW of Source Agnostic Peak Power for Long Term for Commencement year 2029-30 in Petition no 2218/2025NoticePt-no-2218of2025UPPCL-26-08-2025-PDF620202525629PM.pdfNotice dated 18/06/25 for 2218 of 2025 - UPPCL - Approval of tender documents namely RFQ, RFP, and PPA for procurement of 2000 MW of Source Agnostic Peak Power for Long Term for Commencement year 2029-30 in Petition no 2218/2025
12
S.NoRegulation
1Notice dated 25/08/25 for 2219 of 2025 - UPPCL vs LPGCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025
2Notice dated 22/08/25 for 2268 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2268/2025
3Notice dated 19/08/25 for 2261 of 2025 - UPPCL - Approval of PPA dated 16.06.2025 for Khara Small Hydro Project with Total capacity of 1.5 MW (2 x 0.75) for a period of forty years executed between UPPPCL and UPRVUNL in Petition no 2261/2025
4Notice dated 19/08/25 for 2262 of 2025 - UPPCL - Approval of PSA dated 21.06.2025 entered into with NHPC Limited for purchase of 300 MW Capacity of Hybrid Energy. in Petition no 2262/2025
5Notice dated 14/08/25 for 2253 of 2025 - UPNEDA and UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2253/2025
6Notice dated 14/08/25 for 2254 of 2025 - UPNEDA UPPCL - Approval of Power Purchase Agreements (PPA) executed between Project Developers and Uttar Pradesh Power Corporation Limited, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to Uttar Pradesh Power Corporation Limited vide the PPA through RESCO mode under feeder level solarization of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan Scheme (PM KUSUM) Component C-2 Scheme. in Petition no 2254/2025
7Notice dated 12/08/25 for 2207 of 2025 - Ameer Ullah - Revision to set aside the impugned order dated 20.06.2024 of DM Prayagraj in Petition no 2207/2025
8Notice dated 12/08/25 for 2210 of 2025 - UPPCL - Seeking relaxation in complying with directions issued in the orders passed by this Commission in 59SM, 60SM and 61 SM of 2022 in Petition no 2210/2025
9Notice dated 12/08/25 for 2220 of 2025 - UPSLDC - Seeking Clarification of this Commission on the issue of settlement of legacy dues claimed by Northern Region Load Dispatch Centre from the DSM Account maintained by UPSLDC in Commission’s order on petition no. 59 SM, 60SM and 61SM. in Petition no 2220/2025
10Notice dated 12/08/25 for 2222 of 2025 - Obra -C Badaun Transmission Limited - Assignment of License and creation of security interest by way of mortgage/charge/hypothecation/assignment etc. overall the movable and immovable assets of Obra-C Badaun Transmission Limited as provided for in paragraph 11 o this petition in favour of Security Trustee/Rupee Term Lender in Petition no 2222/2025
11Notice dated 11/08/25 for 2223 of 2025 - Ultratech Cement Limited, Lalganj Power Pvt. Limited - Seeking an increase of Voltage connectivity level for Ultratech Cement Limited Tanda Cement Works from 33 kV to 132 kV without (revocation of Connection Agreement dated 10.08.2022 and (ii) relinquishment of LTOA granted under Bulk Transmission Agreement dated 24.12.2021 in Petition no 2223/2025
12Notice dated 08/08/25 for 2248 of 2025 - UPPCL - Seeking approval of Pumped Hydro Storage Power Procurement Agreement dated 23.04.2025 executed between Uttar Pradesh Power Corporation Limited and Adani Hydro Energy Five Limited and adoption of tariff discovered through Request for Selection (“RFS”) invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1250 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2248/2025
13Notice dated 05/08/25 for 2219 of 2025 - UPPCL - Seeking reimbursement of the excess energy charges paid to LPGCL on account of Railways Operations & allied works, Diesel Locomotive Service diesel locomotive pilot and HSD Consumption from August 2023 onwards also with carrying cost. in Petition no 2219/2025
14Notice dated 05/08/25 for 2228 of 2025 - UPPCL - Seeking approval of the Power Supply Agreement (PSA) dated 16.05.2025 for procurement of 1500 MW of power from thermal generating stations to be set up within Uttar Pradesh under the Design, Build, Finance, Own and Operate (DBFOO) model by sourcing fuel from the allocated coal linkage arranged under SHAKTI Policy B(iv) and for adoption of tariff discovered through competitive bidding process. in Petition no 2228/2025
15Notice dated 04/08/25 for 2233 of 2025 - UPRVUNL - Panki Ext. - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in Panki Ext. (1 X660 MW) TPS in Petition no 2233/2025
16Notice dated 04/08/25 for 2237 of 2025 - UPRVUNL – Obra C - Submission of MYT petition for Approval of ARR and Determination of Tariff for FY 2024-25 to FY 2028-29 in respect Obra ‘C’ (2 X660 MW) TPS in Petition no 2237/2025
17Notice dated 04/08/25 for 2249 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2249/2025
18Notice dated 04/08/25 for 2250 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 300 MW of Solar Power for a period of 25 years. in Petition no 2250/2025
19Notice dated 04/08/25 for 2251 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 400 MW of Solar Power for a period of 25 years. in Petition no 2251/2025
20Notice dated 04/08/25 for 2252 of 2025 - UPPCL - Seeking for approval adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure 600 MW of Solar Power for a period of 25 years. in Petition no 2252/2025
21Public Notice dated 30/07/25 for 2166 of 2024 - UPPTCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 in Petition no 2166/2024
22Notice dated 30/07/25 for 2231 of 2025 - UPSLDC vs UPPCL and ors - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2231/2025
23Notice dated 28/07/25 for Petition Number 1681 of 2021 - Amity University vs IL & FS Energy Development Company - Direction for recovery of money, damages and other declatory reliefs regarding PPA dated 16 Oct 2014 in Petition no 1681/2021
24Notice dated 28/07/25 for 2245 of 2025 - UPPCL - Seeking for approval of Pumped Hydro Storage Power Procurement Agreement dated 30.04.2025 executed between Uttar Pradesh Power Corporation Limited and JSW Energy PSP Six Limited and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process to procure energy storage capacity for 1500 MW (For 8 Hours discharge with maximum 6 Hours continuous discharge) from Pumped Hydro Storage Plants for a period of 40 Years. in Petition no 2245/2025
25Notice dated 14/07/25 for Petition Number 2227 of 2025 - UPPCL vs SJVN Ltd - Seeking approval of 1200 MW of firm and Dispatchable RE(FDRE) power in terms of the Power Sale Agreement dated 20.02.2025 from Inter State Transmission System connected Renewable Energy (RE) Power Projects with Energy Storage Systems in India under Tariff based Competitive Bidding. in Petition no 2227/2025
26Notice dated 14/07/25 for 2229 of 2025 - UPPCL vs NTPC - Approval of the PSA dated 11.04.2025 entered into with NTPC Limited for purchase of 1530 MW capacity of Firm and Dispatchable Renewable Energy. in Petition no 2229/2025
27Notice dated 14/07/25 for 2230 of 2025 - UPNEDA UPPCL - Approval of PPA executed between Project Developers and UPPCL, and adoption of tariff discovered through Request for Selection invited for procurement of power through tariff based competitive bidding process from grid connected solar plants connected to selected segregated agriculture feeder of distribution substation with cumulative capacity of 2553.5MW for sale of power to UPPCL vide the PPA through RESCO mode under feeder level solarization of PM KUSUM Component C-2 Scheme. in Petition no 2230/2025
28Notice dated 08/07/25 for 2100 of 2024 - UPPCL - Approval of procurement of 690 MW of Wind Power in terms of the PSA dated 19.10.2023 on long term basis procured through tariff based competitive bidding process held under the Inter State Transmission System Tranche-XIV Scheme. in Petition no 2100/2024
29Notice dated 03/07/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024
30Notice dated 02/07/25 for 967 of 2015 - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 967/2015
31Notice dated 02/07/25 for 968 of 2015 - - Rosa Power Supply Company Ltd.- Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 968/2015
32Notice dated 02/07/25 for 1016 of 2015 - Rosa Power Supply Company Limited - Petition under Section 94(2) of the Electricity Act, 2003 read with Regulation 5(3) and 5(5) of the UPERC (Terms and Conditions of Generation Tariff) Regulations, 2009, Regulation 57 of the UPERC (Conduct of Business) Regulations, 2019 and Article 12 of the PPA seeking implementation of the Common Judgment dated 30.05.2025 passed in Appeal No. 357 of 2017 and Appeal No. 22 of 2018 by the Appellate Tribunal for Electricity and Consequential Reliefs Arising therefrom. in Petition no 1016/2015
33Notice dated 30/06/25 for 2152 of 2024 - UPRVUNL (Anpara -A) - Petition for True-up of 3 x 210 MW Anpara-A TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2152/2024
34Notice dated 30/06/25 for 2153 of 2024 - UPRVUNL (Parichha Ext.-II) -Petition for True-up of 2x 250 MW Parichha Ext.-II TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2153/2024
35Notice dated 30/06/25 for 2154 of 2024 - UPRVUNL (Harduaganj-C) - Petition for True-up of 1 x 110 MW Harduaganj-C TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2154/2024
36Notice dated 30/06/25 for 2155 of 2024 -UPRVUNL (Obra-B) - Petition for True-up of 5 x 200 MW Obra-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2155/2024
37Notice dated 30/06/25 for 2156 of 2024 - UPRVUNL (Harduaganj-Ext) - Petition for True-up of 2 x 250 MW Harduaganj-Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2156/2024
38Notice dated 30/06/25 for 2157 of 2024 -UPRVUNL (Parichha Extn) - Petition for True-up of 2 x 110 MW Parichha Extn. TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2157/2024
39Notice dated 30/06/25 for 2158 of 2024 - UPRVUNL (Anpara-B) - Petition for True-up of 2 x 500 MW Anpara-B TPS of UPRVUNL for FY 2019-20 to FY 2023-24 in Petition no 2158/2024
40Notice dated 27/06/25 for 2224 of 2025 - UPPCL - Seeking approval of procurement of250 MW/1000 MWh Standalone Battery Energy storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2224/2025
41Notice dated 27/06/25 for 2225 of 2025 - UPPCL - Seeking approval of procurement of 375 MW/1500 MWh Standalone Battery Energy Storage Systems (BESS) Energy Storage capacity with Viability Gap Funding (VGF) support. in Petition no 2225/2025
42Public Notice dated 24/06/25 for 2164 of 2024 -Madhyanchal Vidyut Vitran Nigam Limited- True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2164/2024
43Public Notice dated 24/06/25 for 2165 of 2024 - Dakshinanchal Vidyut Vitran Nigam Ltd. - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2165/2024
44Public Notice dated 24/06/25 for 2168 of 2024 - NPCL - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 in Petition no 2168/2024
45Notice dated 20/06/25 for 2221 of 2025 - UPPCL - Approval for SPPA dated 28.04.2025 for supply of 21 MW power from 24.70 MW MSW based power plant at Kuberpur, Agra, UP in Petition no 2221/2025
46Notice dated 20/06/25 for 2226 of 2025 - MEIL Anpara Energy Limited -Petition for reimbursement of expenditure incurred towards transportation of fly ash during FY 2024-25 according to the Notification No. S.O. 5481(E) dated 31.12.2021 issued by the Ministry of Environment, Forest & Climate Change, Government of India and the methodology prescribed by this Hon’ble Commission. in Petition no 2226/2025
47Public Notice dated 20/06/25 for 2162 of 2024 - Paschimanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30
48Public Notice dated 20/06/25 for 2163 of 2024 - Purvanchal Vidyut Vitran Nigam Limited - True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR & Tariff FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2163/2024
49Public Notice dated 20/06/25 for 2176 of 2024 - KESCO -True UP FY 2023-24, Annual Performance Review FY 2024-25 and ARR for FY 2025-26 of the Control Period from FY 2025-26 to FY 2029-30 in Petition no 2176/2024
50Notice dated 18/06/25 for 2218 of 2025 - UPPCL - Approval of tender documents namely RFQ, RFP, and PPA for procurement of 2000 MW of Source Agnostic Peak Power for Long Term for Commencement year 2029-30 in Petition no 2218/2025
 
Chairman's Desk
Total Hits
13093648
Home  |  Picture Gallery  | SiteMap  |  Contact Us
Disclaimer: While every care has been taken to ensure the accuracy of information furnished in this website, UPERC does not accept any responsibility or liability for any damage or loss to any person / institution / organization for the result of any action taken on the basis of this information. However, UPERC shall be obliged if errors / omissions are brought to its notice for carrying out corrections in the next update.
 Design By: WizTech Consultancy      "Best viewed on IE.7 and above at 1024x768 resolution"